The inspection contents include whether safety inspections are conducted in a timely manner in accordance with the Facility Safety Act, the safety status of major structures, and reinforcement of repairs based on the inspection results.
In the case of Maegok Bridge (88m long, two round-trip lanes), Hobeop-myeon, Icheon-si, traffic was restricted as the foundation of the bridge was broken down by Segul (洗掘).
Three row houses in Bucheon, Suwon, and Hwaseong were cracked and transformed to reinforce the underground pillars, beams, and walls.
In addition, cracks and leaks on bridge floor plates, lack of bridge drainage, peeling of balconies and eaves of old houses, and corrosion of rebar were detected.
※ 'Your report becomes news'
[Kakao Talk] YTN Search and Add Channel
[Phone] 02-398-8585
[Mail] social@ytn.co.kr
[Copyright holder (c) YTN Unauthorized reproduction, redistribution and use of AI data prohibited]
Nationwide
View the full list of articles- Cleaning up the fire in the U.S. supply window...Sandwich panel makes it difficult to suppress.
- 3 cars, including Sejong City commuter bus...4 people with a slight injury.
- Rumfiskin occurred at Dangjin Korean Beef Farm in South Chungcheong Province...Temporary suspension of movement of four cities and counties
- [Incheon] Cruise Tourism Revitalization...16 vessels this year → 30 vessels next year